Any civil modifications including the installation and alteration of underground services
New buildings on existing leased lot
Change to an existing building (exterior)
Renovation of an existing facility (interior)
Modification to the primary security line inside or outside (i.e. change locked doors to unlocked, alter fencing, etc.)
External lighting upgrades/reconfigurations
Altering An Existing Building or Lands
Plan on building or renovating?
You need a Facility Alteration Permit (FAP)
You must have an approved Facility Alteration Permit (FAP) for work on airport leased land. This process allows the airport to review, comment and approve projects that may impact operations. The FAP process ensures that changes areadded into the technical drawing database.
Lease holders require a FAP for:
An approved FAPis neededbefore the work begins. Submit FAP applications toAirport Construction & Development. Please include drawings and construction schedules. This processnormallytakes 15 working days. Extra time maybe neededfor based on the complexity of a project.
Development on the airport may need any of the following documents:
The Region of Waterloo Construction Safety/Operations Plan (available from Airport Operations)
Transport Canada/NAV Canada Guidelines (where applicable)
Ontario Occupational Health and Safety Act/Canada Labour Code Part II
Ontario Building Code or National Building Code
Ontario Fire Code or National Fire Code
Environmental Codes and Practices (where applicable)
Region of Waterloo Design Guidelines for Municipal Services
Ontario Electrical Safety Authority Standards
Please note:Extra codes and guidelines may apply.