Any civil modifications including the installation and alteration of underground services
-
New buildings on existing leased lot
-
Change to an existing building (exterior)
-
Renovation of an existing facility (interior)
-
Modification to the primary security line inside or outside (i.e. change locked doors to unlocked, alter fencing, etc.)
-
External lighting upgrades/reconfigurations
Altering An Existing Building or Lands
Lease holders require a FAP for:
An approved FAP is needed before the work begins. Submit FAP applications to Airport Construction & Development. Please include drawings and construction schedules. This process normally takes 15 working days. Extra time may be needed for based on the complexity of a project.
Development on the airport may need any of the following documents:
-
The Region of Waterloo Construction Safety/Operations Plan (available from Airport Operations)
-
Transport Canada/NAV Canada Guidelines (where applicable)
-
Ontario Occupational Health and Safety Act/Canada Labour Code Part II
-
Ontario Building Code or National Building Code
-
Ontario Fire Code or National Fire Code
-
Environmental Codes and Practices (where applicable)
-
Region of Waterloo Design Guidelines for Municipal Services
-
Ontario Electrical Safety Authority Standards
Please note: Extra codes and guidelines may apply.